USAfixTM - Repair Guide (RG) - Master Email RG
- Replace the wiring to the control board
 Level of Difficulty - Medium  Estimated Completion Time - 20 minutes
TASKI - SWINGO 350B

Tools Required
Tool 
Screwdriver-phillips
Wire cutters
Wrench-Allen metric 4.0mm

Parts Required


Step Procedure & Parts & Tools
1 REMOVE THE 14 SCREWS HOLDING THE BACK OF THE HANDLE.
Screwdriver-phillips

2 LIFT UP ON THE BACK OF THE HANDLE TO SEPARATE IT FROM THE FRONT OF THE HANDLE.

3 REMOVE THE 3 SCREWS HOLDING THE CONTROL BOARD.
Screwdriver-phillips

4 FLIP THE CONTROL BOARD OVER. REMOVE THE BOLT HOLDING THE DAMAGED WIRE.
Wrench-Allen metric 4.0mm

5 LIFT UP ON THE RING CONNECTOR TO REMOVE IT FROM THE CONTROL BOARD.

6 CUT OFF THE DAMAGED SECTION OF WIRE.SPLICE NEW RING CONNECTOR TO EXISTING WIRE.
Wire cutters

7 REVERSE STEPS 1 THRU 5 TO REASSEMBLE THE MACHINE.